Day 7

05-30-2018Church Renovation

Today the main work was downstairs in Hansen Hall/furnace room. The have a machine to clean the air ducts. Which in turn brings the soot and the smell back into the basement. A big air purifier is vented outside to help take the smoke smell out. All the wainscoting in the church is taken off. The second dumpster was filled so now we are on number 3.

Click Read More below to see pictures.

BACK TO LIST