Day 134

11-30-2018Church Renovation

The carpet in the main part of the church is going in. Next week they will finish the other side. The new lights have been hung and look beautiful. Charlie is putting a stencil underneath the choir loft. Hanson Hall is getting a railing. The bathrooms are starting to get worked on. Have a wonderful weekend. Do not forget to pick up your raffle tickets after each of the Masses this weekend.

Day 132

11-28-2018Church Renovation

The carpet has arrived and they have started installing up in the choir loft. Charlie is priming Hansen Hall's door so he can wood grain it. The new light fixtures have arrived and Terry's Electric is getting the brackets ready so they can get installed.

Day 130

11-26-2018Church Renovation

The flooring is going in this week. The tile floor in the bathrooms are in. The tile up the center aisle and the sanctuary steps is getting installed. Carpet should be here this week also. Terry's electrical is still hard at work. The ceiling fans have been installed and they are working on the hanging lights.

Day 127

11-21-2018Church Renovation

Work is progressing. Charlie has the dove done on the ceiling in front of the sanctuary and the area where the side altars will be. The wood has been stained on the step fronts. Pews are getting sanded, stained and varnished. They are almost done with the pews. The new covered kneelers should be here soon. Both side sacristy floors have been leveled. Carpeting goes in next week. Terry's Electric is still working on the electrical. Enjoy your Thanksgiving and give thanks for those you have and had in your life.

Day 124

11-16-2018Church Renovation

Hanson Hall has a new ceiling and lighting. It looks so big in there. The pews are getting prepped for new stain and varnish. The dove is going up on the ceiling in front of the sanctuary. Rick is working on the walls by the side altars to get them finished. The back base of the sanctuary is getting extended to hold our new back altar and tabernacle. Everyone have a wonderful weekend.

Day 122

11-14-2018Church Renovation

The ceiling in the church is insulated for the first time. The drop ceiling and lighting is getting installed in Hansen Hall and the room by the elevator. The room is so bright. In the choir loft everything is set in place. The pipes still have to be installed. Painting on the side altars is almost done. The sanctuary steps have been built out to provide more room for the new altars.

Day 117

11-07-2018Church Renovation

News lights are getting hung in the sanctuary. The sanctuary base is getting extended. Charlie is putting second coat on the Hansen Hall walls. The contractors are finally getting caught up for the summer with there obligations so now they can finally have time to get our church done.

Day 115

11-05-2018Church Renovation

Charlie has the first coat of paint on the walls in the basement. The electrical is still getting worked on. The organ and the pipe cabinet is in place and building around it.

Day 114

11-02-2018Church Renovation

They are done in the sanctuary. The pews are all stripped waiting to be stained and varnished. The last coat of mud is going on the sheetrock in the basement. The new windows are installed in Hanson Hall. The guys are wiring and adjusting the choir loft to fit in the new organ. Don't forget the church will be open this weekend after Mass so everyone can walk through to see the progress. Have a Blessed Weekend!